VOLANT home
 
ENERCONNECT
IMPLEMENTATION SERVICES

Transfer
Synchronization
 

   
     

EnerConnect Synchronization Configuration
Deploying EnerConnect in a data synchronization configuration provides the ability for a geoscientist or geotech to define, schedule and manage the process of synchronizing technical data between disparate geoscience applications and data stores. One such example might involve a geophysicist interpreting well data in an OpenWorks project who may want to receive updates to tops being picked by a geologist working the same wells in PETRA. Another example might involve defining a job to keep well header information located in an OpenWorks or PETRA project synchronized to a PPDM master data store. These types of processes are perfect situations to be addressed by EnerConnect Synchronization.

 

 

Solution Features
• Project data currency
• Accurate data reconciliation
• Link projects based on:
• Area of Interest (AOI)
• List of UWIs
• Project Well List
• Automation via job scheduling
• Attribute-level update control
• Job simulation (test) capability
• Web-based user interface
• Job reporting and auditing

 

 
Available Components
• EnerConnect Integration Platform
• EnerConnect Adapters

• PIDM
• ADM
• PPDM
• OpenWorks
• EDM
• PETRA
• INTELLEX

     

EnerConnect Synchronization allows a user to define, schedule and manage a job that will result in an accurate reconciliation and synchronization of geotechnical data based on parameters specified by the user. A synchronization job can be defined based on an area of interest (AOI), a project-based well list or a specific list of well UWIs. The synchronization job can then be executed once or scheduled to recur at a specified time on a daily, weekly or monthly basis. Users have access to a detailed report of the individual data records that were added or updated during a synchronization process.

 
Supported Data Types
• Well Header data
• Tops data
• Directional Survey data

If you struggle to maintain currency of vendor, master and project data in your geoscience environment, leverage EnerConnect Synchronization to ensure that you have the right data at the right time.